navBar

Track geometry measurement

 

 

 

 

Track Quality inspections

We surveyed tracks in The United Kingdom, United States, Philippines, South Africa, Switzerland, Poland. Our clients include: Network Rail (WCML), London Underground, Channel Tunnel Rail Link First Engineering, Grant Rail, Carillion, SBB (Switzerland), Plaserail (South Africa), Summitomo (Manila), Selig Inc. (United States)
 

 

Track Quality inspection - Fast lines

 

Fast Line track quality inspection
Extract from 125 miles per hour, junction Track Quality assessment using TQM trolley - Track quality SD and Track Quality Graph only.

 

 

 

 

 

Track Quality inspection - Slow Lines

 

Slow Line track quality inspection
Sample of Slow Line track quality inspection. Presented Track Quality SD and Track Quality graphs only. Exceedence and Track Action reports are omitted from presentation

 

 

 

 

 

Track quality inspection - Sidings

 

Sidings track quality inspection
Extract from obligatory 6 month periodical sidings inspection showing track deterioration within 1 year period of usage 

 

 

 

 

 

Switch quality inspection

 

Switch quality inspection Switch quality assessments including switch quality SD and switch quality graph. Full switch geometry report is not included in this presentation